Re: Recording Project Workload
Try having a template folder with the clients name and inside there the project name, inside there you can have some folders that are always the same for every client.
Dont know what you do specifically, but try having a phasing stage, lets say, sketches, design, pre planning, planning submision, development, etc, each with a code and a number ( DPA-001) ex design planning application 001 as you revise this it will change numbers.
time lines, shcedules, costs, etc can be tracked down with this.
|