Re: Week #3 WIPs and Renders
Had a free hour or so this afternoon, so I fixed the tiling size, adjusted the length of the PATH for the tap (it was too long), and added the sink and some more textures.
Comments and critiques welcomed.
I still need to do the handles for the taps, the basket on the left, and the vase on the right.
edit: lowered camera and adjusted Gamma (dammit)
__________________
-SandmanNinja
website
|