![]() |
||||||||||||||
|
|
||||||||||||||
|
|||||||
| Notices |
| Hardware and Technical Discusions For general discussions about rendering hardware and technical issues. |
|
|
LinkBack | Thread Tools | Display Modes |
|
|
#1 (permalink) |
|
Senior Member
|
hello,
I need to build the workstation like below, please give me advice.Thanks: -Intel server board S500XVN -CPU Quad_core intel Xeon E5405 or 5410 -Ram Wintec 4G -Power 650 cooler master V2.2 -Card 512 8800Gt. Thanks for your advice.
__________________
a2 Visualization. www.a2viz.com.vn Architecture,interior Design,3D Visualizations. |
|
|
|
|
|
#3 (permalink) |
|
Senior Member
|
Now i have 3 Q6600s with Aus p5k, 4g.ram, 512Mb gefore 8800GT, already. i want to connect them running together.Thanks mate.
__________________
a2 Visualization. www.a2viz.com.vn Architecture,interior Design,3D Visualizations. |
|
|
|
|
|
#5 (permalink) |
|
Senior Member
|
hi,
Sorry i cannot seperate PC and workstation. Actually i want to by 2-3 more Q6600(pc) with the same old ones. But some guy said that i should buy : -Intel server board S500XVN -CPU Quad_core intel Xeon E5405 or 5410 -Ram Wintec 4G -Power 650 cooler master V2.2 -Card 512 8800Gt. This WS can connect with 3 PC Q6600 which i have been bought them.Because now we have big project need to render.And in future we can update easily. Thanks
__________________
a2 Visualization. www.a2viz.com.vn Architecture,interior Design,3D Visualizations. |
|
|
|
| Sponsored Links |
|
|
#6 (permalink) |
|
Moderator
|
I don't understand what your requirements are. A Xeon box without dual CPUs is not much different from a Core 2 box. A Xeon box with dual CPUs will render about twice as fast as a Core 2 box. A Xeon box is a lot more expensive than a Core 2 box.
If what you need is 2-3 more desktop PCs and the Q6600 boxes meet your requirements, then ignore the guy who told you about the Xeons and buy the Q6600. |
|
|
|
|
|
#7 (permalink) |
|
Senior Member
|
Thanks AJLynn,
I will explain what i would like to do like that: 1. Now i had 3 CPUs Q6600 with Aus p5k, 4g.ram, 512Mb gefore 8800GT, it mean i had 3 nodes to render. But dont have a server. 2. I would like to buy 2-3 more same old ones. I mean buying 2-3 CPUs Q6600 with Aus p5k, 4g.ram, 512Mb gefore 8800GT, and link them together becomes 5-6 nodes to render with backburner. 3. Maybe in the future i can update with 10 or 12 nodes to render. What can i do: buy the Xeon( i know xeon will render fast as 2 times with a core 2) or continue with 2-3 more Q6600. Can you explain to me about workstation? Thanks very much.
__________________
a2 Visualization. www.a2viz.com.vn Architecture,interior Design,3D Visualizations. |
|
|
|
|
|
#9 (permalink) |
|
Senior Member
|
Thanks AJLynn,
Can i ask you one question, please advice to me: I will buy one Xeon with 2CPU and will use it to manage 7-10 Q6600. How do you think. Thanks for your advice.
__________________
a2 Visualization. www.a2viz.com.vn Architecture,interior Design,3D Visualizations. |
|
|
|
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | |
| Display Modes | |
|
|
|
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Dell workstation is BALLS-slow! | ShaunDon | Hardware and Technical Discusions | 8 | March 2nd, 2007 06:42 AM |
| Video Performance - Workstation vs Remote Desktop | Jeff Mottle | Hardware and Technical Discusions | 3 | November 20th, 2006 08:20 AM |
| Workstation for 3DS Viz & Vray. | Nick_f | Hardware and Technical Discusions | 24 | October 3rd, 2006 01:34 AM |
| New workstation | voltaire_ira | Hardware and Technical Discusions | 17 | June 7th, 2005 07:15 PM |
| Ideal Workstation Configuration | Elliot | Hardware and Technical Discusions | 34 | September 22nd, 2004 07:27 PM |